Replacing spreadsheets for maintenance management: what to move first
Replacing spreadsheets for maintenance management? Move the files others act on first: work orders, planned jobs and the asset data behind them.
Replacing spreadsheets for maintenance management? Move the files others act on first: work orders, planned jobs and the asset data behind them.

When you replace spreadsheets for maintenance management, move first the ones other people act on: requests and work orders, the planned jobs schedule, and the location and asset structure both depend on. Reference lists, old history and personal trackers can follow once the daily work runs in one system.
Most teams plan the move the other way round. They start with whatever imports cleanly (the asset list, the supplier contacts) and leave the scary file for last. You know the one: "WO log FINAL v3 (Rita's copy)", with more tabs than anyone has opened, built by someone who left before the last reorganisation. That file is scary because everyone depends on it, which is the reason it should go first.
Spreadsheets fail at the handoffs. A file one person keeps for themselves is slow, but rarely dangerous. A file that a supervisor, two technicians and a supplier all edit, or that gets emailed out every Friday, is where updates go missing and a reported fault never reaches the person who'd fix it.
Moving the easy files first leaves those handoffs where they were, and adds a new one: half the team works in the new system and half still in the spreadsheet. Two versions of the truth are worse than one bad one, and it's where a lot of migrations stall.
Rank each spreadsheet by the damage it does when it's wrong, not by how easy it is to import. Four questions sort most of them:
Who acts on it? The more people, and the more of them outside your team (suppliers, clients, site staff), the earlier it moves.
How often does it change? A file edited every day carries more risk than one opened at year end.
What happens if a row is wrong or missing? A missed statutory inspection or an unattended fault outranks a typo in a supplier's phone number.
How many copies exist? If three people keep their own version, the file has already split, and every copy needs retiring.
Run the list with the people who use the files, not only the person who owns them. The supervisor knows which spreadsheet they trust. The technicians know which one they ignore.
In most operations, three come out on top: the location and asset structure, requests and work orders, and planned jobs. Each depends on the one before it, so move them in that order, as close together as you can.
Work orders and planned jobs hang on a location, and usually on an asset. Without that structure in place first, every job you move lands in a free-text field, and you'll be cleaning it up for months.
The trap is trying to finish the asset register before go-live. You don't need every light fitting on day one. Start with sites, buildings and the areas inside them, then the assets you plan maintenance on and the ones that fail often. The rest can come in as technicians tag assets on their rounds (this guide to asset tagging helps if you're starting from scratch).
Settle naming before you import. "Boiler 2", "BLR-02" and "the old boiler in the basement" are one asset in three files, and a system will treat them as three.
This is the spreadsheet with the most hands on it, and the one behind every "What's the status?" and "Who's handling this?" of the week. While it stays, a request travels from email to spreadsheet to phone call, and each hop is a chance to lose it.
Bring across open work orders and leave closed ones behind unless you'll use them. History is worth importing when you'll analyse it: to spot recurring failures on an asset, or a supplier who keeps coming back for the same fault. If nobody will run that analysis, archive the file read-only and keep it for reference.
Change how requests come in at the same time. If site staff or clients keep emailing faults to one inbox, the spreadsheet will grow back within weeks. Give them a way to report straight into the system.
The planned maintenance spreadsheet carries the compliance risk. A missed row is a missed inspection, and nothing warns you until the auditor asks for the record.
Move it with the assets it covers, and don't copy it as it is. The move is the cheapest moment to review it: frequencies that no longer match how the asset fails, jobs nobody has done in a year, duplicate tasks two people set up separately. A plan copied across untouched brings its mistakes with it, now with automatic reminders.
Check statutory and contractual frequencies against their source documents as you go, not against the old spreadsheet.
Anything one person maintains, that changes rarely and that nobody else acts on can wait. That usually means:
Closed work order history you won't analyse: archive it read-only.
Reference lists, like supplier contacts or spare parts catalogues, until the core work is running.
Stock, if it's small and one person manages it.
Budget tracking, usually next in line, because it gets more useful once costs come from real work orders.
Personal trackers, like a supervisor's own to-do list. These tend to disappear on their own once the work lives in one place.
"Later" needs a date. Without one, the spreadsheet you meant to retire next quarter becomes the one a new hire inherits years from now, still labelled "temporary".
Give every spreadsheet you move a switch-off date, make it read-only on that day, and send every new request to the new system from then on. Running both in parallel feels safe, but two editable sources mean two versions of every job.
Three things decide whether the switch sticks:
An owner per file. One person decides when it goes read-only and answers "Can I still use the old one?"
The least technical user. If the technician who hates apps can't close a job on their phone in a plant room with no signal, the job goes on paper and someone types it into a spreadsheet at the end of the day. It's one of the things to check before switching maintenance software, and it matters just as much when you're switching from Excel.
The first report. When the monthly report comes out of the new system instead of a spreadsheet export, the move has worked. Here's which KPIs to include in a monthly maintenance report.
Shared spreadsheets are the most fragile handoffs, so they move with work orders, not after them. For in-house teams, that's usually the job list sent to a supplier by email, out of date the moment it's sent. For service providers, it's often the export a client gets as proof of delivery, put together by hand at the end of the month.
In both cases the fix is the same: the supplier or the client works in the same workspace as you and sees each job's status as it changes. Service providers have one more spreadsheet to watch, the one where jobs, paperwork and timesheets get reconciled after the fact. Separate apps for jobs, paperwork and timesheets cause the same problem as separate spreadsheets.
Infraspeak, the collaborative FM platform, imports your existing data from standard Excel templates, in the same order this guide recommends: structure first, then the work. The templates cover:
Clients, locations and users
Complex buildings
Maintenance and equipment categories
Assets
Preventive maintenance plans
SLAs, work orders and stock
Once the data is in, the handoffs move with it:
Requests: site staff and clients report faults through Infraspeak Direct Portal, or by scanning a QR code that opens Infraspeak Direct Page, with no login.
Suppliers: Infraspeak Network connects you and your suppliers in a single workspace, with real-time updates and in-app messages.
Technicians: Infraspeak Mobile runs work orders and planned jobs offline, and syncs when the signal comes back.
Assets: MTBF and MTTR are calculated automatically, so the reliability figures you used to build by hand come from the work itself.
Our Customer Success team helps you set up the platform and plan the move, from what goes first to when each spreadsheet is switched off.
Clean the structure before: location and asset names, categories and duplicates. Open work orders can be cleaned as they're closed in the new system, which is faster than fixing them in a spreadsheet nobody will open again.
As briefly as you can, and never with both editable. Set the switch-off date before go-live, and keep the old file read-only for reference after it.
One person for the overall plan, and one owner for each spreadsheet being retired. The file owner is usually whoever built it or updates it most, because they know which columns matter and which nobody has looked at in years.
In a multi-site operation, moving site by site keeps the risk contained, as long as each site moves fully: structure, work orders and planned jobs together. A site that's half in each system is harder to run than one that hasn't moved yet.