Contractor onboarding checklist: induction, permits, certificates
A contractor onboarding checklist for FM teams: what to check for inductions, permits and certificates, and how to stop work starting too early.
A contractor onboarding checklist for FM teams: what to check for inductions, permits and certificates, and how to stop work starting too early.

A contractor onboarding checklist covers three things: the site induction, the permits each job needs and the certificates that prove the contractor is competent and insured. Ticking it once, when the contractor joins your supplier list, isn't enough. Inductions belong to a site, permits belong to a job and certificates expire, so the checks have to happen again when the work starts.
Most operations already have the checklist. What breaks is the handoff. The FM office or procurement collects the paperwork, files it and moves on. Weeks later, a technician the office has never met arrives at a site the induction never covered, to do a job nobody issued a permit for. Everyone did their part. The gap was between them.
Below is a checklist sorted by when each check goes out of date, and a way to tie it to the job so work can't start until it's done.
A contractor onboarding checklist should cover four levels: the company, each person who'll come on site, each site they'll work at and each job they'll do. Sorting the checks this way tells you how often each one has to be repeated.
Level | What you check | When to check it again |
|---|---|---|
Company | Insurance, trade accreditations, safety policy, method statements for the type of work | When a document expires or is renewed, and when the scope of work changes |
Person | Qualifications and competence cards for the trade, training records, ID | Before each person's first visit, and when their cards expire |
Site | Site induction: hazards, emergency procedures, access rules, local contacts | Before each person's first visit to that site, and when the site's rules change |
Job | Permit to work, job risk assessment, isolations, PPE | Before every job that needs them |
Most checklists stop at the first row. The company file is the easiest part to collect and the least useful on the day. It proves the contractor's business is insured. It says nothing about whether the person in your plant room knows where the asbestos register is.
Contractor onboarding checklists fail when the checks are done once, in an office, and stored where the person on site can't see them. The gaps tend to show up in one of four ways:
Expired documents. The insurance or competence card was valid at onboarding and lapsed before the next visit. Nobody checked again, because the contractor was already approved.
The wrong person. The company was onboarded, but the technician who turns up is new, a temp or a subcontractor nobody named. The file holds someone else's cards.
The wrong site. The contractor was inducted at one building and sent to another, with different plant, different hazards and a different evacuation route.
The missing permit. An urgent job goes ahead without one, because the person who issues permits isn't on site at 7pm.
Each of these is a handoff failure: the check sat with one team and the work happened with another. Adding more paperwork to the onboarding file won't close that gap. Moving the check to the job will.
A site induction tells a contractor what's different about this building: its hazards, its rules and who to call. It should be specific to the site and recorded per person, with the date and the version of the induction they received.
A useful contractor induction covers:
Emergency procedures: alarms, evacuation routes, assembly points and first aid.
Known hazards: the asbestos register, confined spaces, roof access and restricted areas.
Access and sign-in: how to sign in and out, where keys and access cards come from, and permitted working hours.
How work is authorised: which jobs need a permit, who issues it and how isolations are done.
Rules for occupied buildings: quiet hours in a hotel, trading hours in a shop, infection control in a hospital.
The site contact: who the contractor reports to on arrival, and who to call when something isn't right.
An induction goes out of date when the site changes: a refurbishment, new plant, a new escape route. Give each induction a version number, and treat a new version as a reason to re-induct, as well as any fixed interval your safety policy sets.
A permit to work is a written authorisation for one high-risk job, in one place, for one time window. Your safety management system decides which jobs need one. In most FM operations, the list includes:
Hot work, such as welding, brazing and cutting
Work at height and roof access
Confined space entry
Electrical work, and any job that needs energy isolated with lockout-tagout
Work on fire alarms, sprinklers and other life safety systems
A permit has a life cycle. It's issued once the job's risks have been assessed, accepted by the person doing the work and closed when the work is finished and the area is safe. The close-out is the weak point. A permit left open on a fire alarm can mean the building is running with part of its protection switched off.
Reactive jobs are where permits get skipped. If the permit lives on paper in the site office, an out-of-hours call-out will go ahead without one.
Collect two kinds of certificates: the ones that prove a contractor can do the work, before they start, and the ones that prove the work was done properly, after they finish. Most onboarding checklists only ask for the first kind.
Liability insurance with cover that suits the work and the sites
Trade accreditations and registrations for regulated work, such as gas or electrical
Competence cards and qualifications for each technician
The contractor's safety policy and method statements
Inspection and test certificates for statutory maintenance
Commissioning records for new equipment
Photos and readings that show the job was done
Certificates collected after the job are your audit evidence. When they arrive by email days later, they end up in an inbox instead of against the asset, and the next audit turns into a search. Keeping them on the job record is the simplest way to stay audit-ready across sites.
Attach the checks to the job and make completing them a condition for starting it. When the technician opens the work order, the job checks are in front of them, and the work can't begin until each one is done and acknowledged.
Split your checklist by level. Company and person checks live with the supplier record. Site and job checks live with the work.
Build one checklist per type of high-risk job: hot work, work at height, electrical isolation and the rest of your permit list.
Attach the site rules to the checklist, so the contractor reads and accepts them on the job, at the site.
Make the checklist a hard stop. A reminder can be dismissed. A block can't.
Ask for the evidence inside the job: photos, readings and certificates attached to the work order before it's closed.
Review the exceptions. A job closed without its evidence, or a contractor who keeps failing the same check, belongs on the agenda of the next contract review.
The decision stays with the people who know the site. The checklist makes sure the questions get asked. The technician and the site team still judge whether it's safe to go ahead.
Infraspeak brings contractors into the same workspace as your own team and attaches the onboarding checks to the work itself.
Infraspeak Network onboards suppliers into a shared workspace and standardises how each one is set up, so contractors know your protocols, standards and expectations before their first job.
Gatekeeper adds checklists to Work orders and Planned jobs: PPE, weather conditions, safety steps and site risk assessments. The technician can't start the job until every condition is met and acknowledged. Attach site guidelines or safety protocols and the contractor has to read and accept them before going ahead.
Documents and evidence stay with the job. Technicians attach certificates, documents and photos from the mobile app, and service providers can generate an audit-ready report that merges the work order or planned job order with its PDF certificates in one file.
See how Infraspeak Network brings your contractors into your operation.
Prequalification decides whether you'll hire a contractor, based on competence, safety record, insurance and financial standing. Onboarding gets a contractor you've already chosen ready to work on your sites. The documents overlap, but onboarding adds the site and job checks.
Yes. The checks are for the person on site, whoever employs them. Ask the main contractor to name who will attend each job, and check those people's competence and induction the same way you would the main contractor's own staff.
When the site changes, when the induction itself is updated and at whatever interval your safety policy sets. A contractor who hasn't been on a site for a long time should be treated as new to it.
The general part, such as your company rules and how work is authorised, works well online. The site-specific part usually needs a walk-round or a briefing on arrival, because hazards and escape routes are easier to show than to describe.